The purpose of the structures supplied was exclusively for roofing trusses as well as side cladding. The architect was instructed to design in order to give a bit of a different aesthetic appeal to the schools towards the standard look of most other schools

Initially wood was considered for the project, however, after consulting with the project team they changed their view of what can be done with Light Steel Frame, clad with Klip-Lok Colourplus/Chromadeck sheeting.

Furthermore, the much lighter roofs reduced the loading on the supporting structure, especially on the walkways. We were also able to do a low pitch, long span truss, for a much more cost effective price than other materials like wood.

We used a C-section; G550 – LSF section to manufacture the trusses, with a Zincalume coating as well as Zincalume top hat 40 & 20 sections for the roof and ceiling battens. The roof sheeting was done with Cliptite, Dark Dolphin sheeting.

There were no real challenges on the manufacturing side, as all the trusses were only varying in length for the different buildings.

LSF was however chosen due to the speed & accuracy of manufacturing that was able to be maintained as most of the schools were build more or less the same time, by different contractors, but had to receive their roofs at more or less the same time.

The design of the side cladding and finishing there were the key factors in giving the project a different but very pleasing aesthetical look.

We were already approached at the design stage to verify that the plans and ideas of the professional team will be able to be executed, which made communication during the project a lot easier as all parties knew what was expected and what the final look that the architect envisioned looked like. There were therefore minimal practical challenges on site.

Project motivation editorials are provided by the project nominator. If any technical details, company names or product names are incorrect, please notify the SAISC so that the error can be corrected.

LSFB /  LIGHT STEEL FRAME BUILDING WORK
Completion date of LSFB work Nov 2018
Completion date of full project Jan 2019
Tons of LSF used 84,169 ton
Span of trusses and Kg/m2 (if applicable) 4.9  kg/sq.m including Top hat 40 & Th 20 Ceiling batten
Profiles used  Frame master 89 x 39 x 12
Type of cladding Klip-Tite

CLADDING
Completion date of cladding Okt 2018
Cladding profile/ type used GRS Klip-Tite
Cladding area/ coverage and tonnage 17132sq.meter

PROJECT TEAM COMPANY
Nominator Siteform
Client/ Developer DBSA
Architect Cube
Structural Engineer Thusabatho Consulting
Engineer WSP
Quantity Surveyor DPD
Main Contractor Sedtrade Sky Construction
Steelwork Contractor Siteform
Cladding Manufacturer Global Roofing Solutions
Cladding Contractor Siteform
Corrosion Protection
Galvanising
Chromadeck Sheet Dark Dolphin