The prevous house was Timber and our new customer insisted on LGS.   We have done the foundations with timber poles and footings, a concrete deck with LGS joist, IBR sheeting with 80mm 25MPA Concrete system fitted with a 40mm EPS Polystyrene for additional R Value on insulation.   Cladded with Marley shiplap Fibre cement boards and OSB with Tyvec membrane and ISOVER Cavitybat.  Internal boards was Marley 15mm firestop boards.

Lgs trusses on mono pitch with Diamond deck.

Allocation:   Knysna
Square meters:   162sq
Duration:  11 Weeks

Steel supplier:  Pholaco
Main contractor:  Rancor
Structural Engineering:  EMC Engineering

If you were a part of this project, and your company details are incorrect or missing – please notify the SAISC so that the error can be corrected.