External cladding Marley FC Boards with OSB, Tyvec membrane and ISOVER Cavitybat fitted internally with 15mm Marley Gypsum boards and fully skimmed.  Joist mezzanine floor system of span of 6.5 meters with 15mm FC Boards and special 50mm x 2 Genises sound mats inside the cavity of the joist system.

Light steel frame roof on the on side of the project and Timber rafter on the Lounge section which was double volume.

Allocation:   Knysna
Square meters:   168sq
Duration:  10 Weeks

Nominator: Rancor
Steel supplier:  Pholaco
Main contractor:  Rancor
Structural Engineering:  EMC Engineering