Project Type
Project Team Interview Case Study
Location
Steel Profiles Used
  • Date of Steelwork Completion
    2025-06-02
  • Tonnage
    4
Metal Cladding and Roofing Overview
  • Date of Cladding Completion
    2025-06-02
  • Material Used
    100x50x2mm Stainless Steel C-Channels
  • Cladding Tonnage
    10
  • Cladding Area Coverage (m2)
    600
Project Overview

To design a new iconic shading roof structure for this focal point of the school.We used flat bars as the main hangers, with C-channels used as the roofing material. We have a catenary shaped cable system below to prevent wind uplift forces. The end cables are inclined to provide the lateral stability for the structure.

Project Details
The C-channels are bolted to the hangers.The pattern of the roof was limited to 6m due to the maximum length of the bend press to form the channels. Finalising the pattern was an iterative and complex process, to mitigate the limited coil availability and to limit the offcuts on the project.
The existing concrete edge beam was under reinforced. The remedial design and construction was a challenge and resulted in delays. Teamwork and collaboration solved the issues. We created a temporary laydown area at the top of the site. To accommodate the operational school we seperated the work from the school with shade cloth barricades. The school's exam timetable posed a challenge and no-work was allowed during matric exam papers. We adjusted the work hours on site to suit.
Benefits of Steel in this Application

Pure tensile design that is the best material property of steel.

Testimonials

1) Structural design is elegantly executed in the connections.

2)The simplest of principles (all elements in tension) was elegantly applied in this spectacular and aesthetically pleasing structure.