Cellular beams were installed across the building span to support cast-in-place floors. The result is a rigid, grid-like framework that strengthens the entire structure.

Project Details
Fabrication was interesting. The challenge was installation. Holes through the wall were cored and usually misaligned.
Access to work area/ space was a challenge. Solution was to work over weekends and holiday while civil teams were away.
Testimonials

Providing a standard system with clear spans really future-proofs the building for future generations, even if internal partitions are removed or shuffled in future.