Project Type
Project Team Interview Case Study
Project Summary Case Study
Steel Profiles Used
  • Date of Steelwork Completion
    2023-07-01
  • Tonnage
    140
  • Plates
    Commercial Quality & EN S355JR Structural Plates
Project Details
Challenge: Very high installation requirements - +78m. Solution: Modulization of walkways and pre-assembly in workshop. Helical vortex breaker.
Benefits of Steel in this Application

Concrete was cheaper than steel. However if the client went with concrete there would be an additional capex
and opex cost as they would require fans. By being able to roll a tapering stack we calculated there would be a natural draft thus eliminating additional capex and opex costs. The pay back period was in the region of 4 years. Steel was selected as the material of construction due to its strength. The ability to fabricate the Stack in sections off site and transport in large abnormal loads.

Testimonials

The team at Betterect are proud of on time delivery, adherence to strict quality standards and fabrication tolerances
and assisting client with design modification to suit safer installation.